Showing posts with label Release 11. Show all posts
Showing posts with label Release 11. Show all posts

Monday, October 4, 2010

3GPP Green activities / Energy Saving initiatives


3GPP has been working on Energy saving initiatives for Release-10 and Release-11. Here is a very quick summary of some of these items.

Telecommunication management; Study on Energy Savings Management (ESM)

Most mobile network operators aim at reducing their greenhouse emissions, by several means such as limiting their networks' energy consumption.

In new generation Radio Access Networks such as LTE, Energy Savings Management function takes place especially when mobile network operators want e.g. to reduce Tx power, switch off/on cell, etc. based on measurements made in the network having shown that there is no need to maintain active the full set of NE capabilities.

By initiating this Work Item about Energy Savings Management, 3GPP hopes to contribute to the protection of our environment and the environment of future generations.

The objective of this technical work is to study automated energy savings management features. Usage of existing IRPs is expected as much as possible, e.g. Configuration Management IRP, etc. However, this technical work may identify the need for defining a new IRP.

The following operations may be considered in this study item (but not necessarily limited to):
• Retrieval of energy consumption measurements
• Retrieval of traffic load measurements
• Adjust Network Resources capabilities


OAM aspects of Energy Saving in Radio Networks

There are strong requirements from operators on the management and monitoring of energy saving functions and the evaluation of its impact on the network and service quality. Therefore an efficient and standardized Management of Energy Saving functionality is needed. Coordination with other functionalities like load balancing and optimization functions is also required.

The objectives of this work item are:
• Define Energy Savings Management OAM requirements and solutions for the following use cases,
• eNodeB Overlaid
• Carrier restricted
• Capacity Limited Network
• Define OAM requirements and solutions for coordination of ESM with other functions like
• Self-Optimization
• Self Healing
• Traditional configuration management
• Fault Management
• Select existing measurements which can be used for assessing the impact and effect of Energy Saving actions corresponding to above Energy Saving use cases.
• Define new measurements which are required for assessing the impact and effect of Energy Saving actions, including measurements of the energy consumption corresponding to above Energy Saving use cases.


Study on impacts on UE-Core Network signalling from Energy Saving

Energy Saving (ES) mechanisms are becoming an integral part of radio networks, and consequently, of mobile networks. Strong requirements from operators (for reasons of cost and environmental image) and indirectly from authorities (for the sake of meeting overall international and national targets) have been formulated. With the expected masses of mobile network radio equipment as commodities, in the form of Home NB/eNBs, this aspect becomes even more crucial.

It is necessary to ensure that ES does not lead to service degradation or inefficiencies in the network. In particular:
• the activation status of radio stations (on/off) introduces a new scale of dynamicity for the UE and network;
• mass effects in signalling potentially endanger the network stability and need to be handled properly.

It is unclear whether and how currently defined procedures are able to cope with, and eventually can be optimized for, ES conditions; thus a systematic study is needed.

The study aims, within the defined CT1 work areas, at:
• analysing UE idle mode procedures and UE-Core Network signalling resulting from frequent switch on/off of radio equipment in all 3GPP accesses, including home cell deployment and I-WLAN;
• performing a corresponding analysis for connected mode UEs;
• analysing similar impacts from activation status of non-3GPP access networks;
• documenting limitations, weaknesses and inefficiencies in these procedures, with emphasis on mass effects in the UE-Core Network signalling;
• studying potential optimizations and enhancements to these procedures;

The study shall also evaluate and give recommendations on potential enhancements to 3GPP specifications (whether and where they are seen necessary).


Study on Solutions for Energy Saving within UTRA Node B

Due to the need to reduce energy consumption within operators’ networks, and considering the large amount of UMTS network equipment deployed in the field around the world, the standardisation of methods to save energy in UMTS Node Bs is seen as an important area of study for 3GPP.There has not been a large amount of focus on energy-saving in UMTS networks so far in 3GPP, although some solutions have been agreed in Release 9. Therefore it is proposed to start an initial study phase to identify solutions and perform any initial evaluation, such that a subset of these proposals can be used as the basis for further investigation of their feasibility.

The objective is to do an initial study to identify potential solutions to enable energy saving within UMTS Node-Bs, and do light initial evaluation of the proposed solutions, with the aim that a subset of them can be taken forward for further investigation as part of a more focused study in 3GPP.

The solutions identified in this study item should consider the following aspects:
• Impacts on the time for legacy and new UEs to gain access to service from the Node B
• Impacts on legacy and new terminals (e.g. power consumption, mobility)

Some initial indication of these aspects in relation to the proposed solutions should be provided.


Study on Network Energy Saving for E-UTRAN

The power efficiency in the infrastructure and terminal should be an essential part of the cost-related requirements in LTE-A. There is a strong need to investigate possible network energy saving mechanisms to reduce CO2 emission and OPEX of operators.

Although some solutions have been proposed and part of them have been agreed in Release-9, there has not been a large amount of attention on energy saving for E-UTRAN so far. Many potential solutions are not fully shown and discussed yet. Therefore, it is proposed to start an initial study phase to identify solutions, evaluate their gains and impacts on specifications.

The following use cases will be considered in this study item:
• Intra-eNB energy saving
• Inter-eNB energy saving
• Inter-RAT energy saving

Intra-eNB energy saving, in EUTRAN network, a single cell can operate in energy saving mode when the resource utilization is sufficiently low. In this case, the reduction of energy consumption will be mainly based on traffic monitoring with regard to QoS and coverage assurance.

A lot of work on Inter-eNB energy saving has already been done for both LTE and UTRA in Rel-9. This Study Item will investigate additional aspects (if any) on top of what was already agreed for R9.

Inter-RAT energy saving, in this use case, legacy networks, i.e. GERAN and UTRAN, provide radio coverage together with E-UTRAN. For example E-UTRAN Cell A is totally covered by UTRAN Cell B. Cell B is deployed to provide basic coverage of the voice or medium/low-speed data services in the area, while Cell A enhances the capability of the area to support high-speed data services. Then the energy saving procedure can be enabled based on the interaction of E-UTRAN and UTRAN system.

The objective of this study item is to identify potential solutions for energy saving in E-UTRAN and perform initial evaluation of the proposed solutions, so that a subset of them can be used as the basis for further investigation and standardization.

Energy saving solutions identified in this study item should be justified by valid scenario(s), and based on cell/network load situation. Impacts on legacy and new terminals when introducing an energy saving solution should be carefully considered. The scope of the study item shall be as follows:
• User accessibility should be guaranteed when a cell transfers to energy saving mode
• Backward compatibility shall be ensured and the ability to provide energy saving for Rel-10 network deployment that serves a number of legacy UEs should be considered
• Solutions shall not impact the Uu physical layer
• The solutions should not impact negatively the UE power consumption

RAN2 will focus on the Intra-eNB energy saving, while RAN3 will work on Inter-RAT energy saving and potential additional Inter-eNB energy saving technology.


Study on Solutions for GSM/EDGE BTS Energy Saving

There has not been a large amount of focus on energy-saving in GSM/EDGE networks so far in 3GPP, although some solutions have been agreed in previous Releases, notably MCBTS. Therefore it is proposed to start an initial study phase to identify solutions and perform any initial evaluation, such that a subset of these proposals can be used as the basis for further investigation of their feasibility.

The objective is to study potential solutions to enable energy saving within the BTS (including MCBTS and MSR), and evaluate each proposed solutions in detail. These potential solutions shall focus on the following specific aspects
• Reduction of Power on the BCCH carrier (potentially enabling dynamic adjustment of BCCH power)
• Reduction of power on DL common control channels
• Reduction of power on DL channels in dedicated mode, DTM and packet transfer mode
• Deactivation of cells (e.g. Cell Power Down and Cell DTX like concepts as discussed in RAN)
• Deactivation of other RATs in areas with multi-RAT deployments, for example, where the mobile station could assist the network to suspend/minimise specific in-use RATs at specific times of day
• And any other radio interface impacted power reduction solutions.

The solutions identified in this study item shall also consider the following aspects:
• Impacts on the time for legacy and new mobile stations to gain access to service from the BTS
• Impacts on legacy and new mobile stations to keep the ongoing service (without increasing drop rate)
• Impacts on legacy and new mobile stations implementation and power consumption, e.g. due to reduction in DL power, cell (re-)selection performance, handover performance, etc.
• Impacts on UL/DL coverage balance, especially to CS voice

Solutions shall be considered for both BTS energy saving non-supporting and supporting mobile stations (i.e. solutions that are non-backwards compatible towards legacy mobile stations shall be out of the scope of this study).

Wednesday, June 2, 2010

Quick preview of 3GPP Release-11 Features and Study items


Release 11 Features

Advanced IP Interconnection of Services

The objective is to specify the technical requirements for carrier grade inter-operator IP Interconnection of Services for the support of Multimedia services provided by IMS and for legacy voice PTSN/PLMN services transported over IP infrastructure (e.g. VoIP). These technical requirements should cover the new interconnect models developed by GSMA (i.e. the IPX interconnect model) and take into account interconnect models between national operators (including transit functionality) and peering based business trunking. Any new requirements identified should not overlap with requirements already defined by other bodies (e.g. GSMA, ETSI TISPAN). Specifically the work will cover:

• Service level aspects for direct IP inter-connection between Operators, service level aspects for national transit IP interconnect and service level aspects for next generation corporate network IP interconnect (peer-to-peer business trunking).
• Service layer aspects for interconnection of voice services (e.g. toll-free, premium rate and emergency calls).
• Service level aspects for IP Interconnection (service control and user plane aspects) between Operators and 3rd party Application Providers.

To ensure that requirements are identified for the Stage 2 & 3 work to identify relevant existing specifications, initiate enhancements and the development of the new specifications as necessary.


Release 11 Studies

Study on IMS based Peer-to-Peer Content Distribution Services

The objectives are to study IMS based content distribution services with the following aspects:

- Identifying the user cases to describe how users, operators and service providers will benefit by using/deploying IMS based content distribution services. such as with the improvement of Peer-to-Peer technology. The following shall be considered:
- Mobile access only (e.g. UTRAN, E-UTRAN, I-WLAN);
- Fixed access only (e.g. xDSL, LAN);- Fixed and mobile convergence scenarios;
- Identifying service aspects where IMS network improvements are needed to cater for content distributed services for above accesses;
- Evaluating possible impacts and improvements on network when IMS based content distribution services are deployed;
- Identifying QoS, mobility, charging and security related requirements in the case of content distribution services on IMS;
- Identifying potential copyright issues;


Study on Non Voice Emergency Services

The Non Voice Emergency Services could support the following examples of non-verbal communications to an emergency services network:

1. Text messages from citizen to emergency services
2. Session based and session-less instant messaging type sessions with emergency services
3. Multi-media (e.g., pictures, video clips) transfer to emergency services either during or after other communications with emergency services.
4. Real-time video session with emergency services

In addition to support the general public, this capability would facilitate emergency communications to emergency services by individuals with special needs (e.g., hearing impaired citizens).

The objectives of this study include the following questions for Non Voice Emergency Services with media other than or in addition to voice:

1. What are the requirements for Non Voice Emergency Services?
2. What are the security, reliability, and priority handling requirements for Non Voice Emergency Services?
3. How is the appropriate recipient emergency services system (e.g., PSAP) determined?
4. Are there any implications due to roaming?
5. Are there any implications to hand-over between access networks
6. Are there any implications due to the subscriber crossing a PSAP boundary during Non Voice Emergency Services communications (e.g., subsequent text messages should go to the same PSAP)?
7. Do multiple communication streams (e.g., voice, text, video emergency services) need to be associated together?
8. What types of “call-back” capabilities are required?9. Investigate the load impact of Non Voice Emergency Services in the case of a large scale emergency event or malicious use.

Non Voice Emergency Services will be applicable to GPRS (GERAN, UTRAN) and to EPS (GERAN, UTRAN, E-UTRAN and non-3GPP).


Study on UICC/USIM enhancements

The intent of this study item is to identify use cases and requirements enabling Mobile Network Operators to distribute new services based on the USIM, to improve the customer experience and ease the portability and customisation of operator-owned and customer-owned settings from one device to another (such as APN and other 3G Notebook settings, graphical user interface, MNO brand, Connection Manager settings,…), and help in reducing operation costs and radio resources usage.


Objectives of this study item are:

-To identify use cases and requirements for new USIM
-based services taking into account the GSMA Smart SIM deliverables;
- To identify use cases and requirements for the USIM used inside terminals with specialised functionalities (e.g. radio modems, 3G Notebook terminals) taking into account the GSMA 3GNBK deliverables;
- To identify use cases and requirements to drive the evolution from the traditional USAT to a multimedia USIM toolkit support, with a particular aim to the Smart Card Web Server;


Study on Alternatives to E.164 for Machine-Type Communications

M2M demand is forecast to grow from 50M connections to over 200M by 2013. A large number of these services are today deployed over circuit-switched GSM architectures and require E.164 MSISDNs although such services do not require "dialable" numbers, and generally do not communicate with each other by human interaction.


Without technical alternative to using public numbering resources as addresses, and considering the current forecasts and pending applications for numbers made to numbering plan administration agencies, there is a significant risk that some national numbering/dialling plans will run out of numbers in the near future, which would impact not only these M2M services but also the GSM/UMTS service providers in general.


The Objective is to determine an alternative to identify individual devices and route messages between those devices. Requirements for this alternative include:

- Effectively identify addressing method to be used for end point devices
- Effectively route messaging between those devices
- Support multiple methods for delivering messages, as defined by 22.368
- Support land-based and wireless connectivity
- Make use of IP-based network architectures
- Addressing/identifiers must support mobility and roaming- support on high speed packet
-switched networks when available and on circuit-switched networks
- Consider if there are security issues associated with any alternatives